Manual Cement Roof Tile Manufacturing Machinery

Manual Cement Roof Tile Manufacturing Machinery

Manual Cement Roof Tile Manufacturing Machinery Production Process 1. Vibration After the vibration of the mixture caused by cement, sand and water, the water will be removed during the production process 2. Curing Generally, wet tiles should be cured naturally on the tray for 24 hours, and the...
Send Inquiry
Product Introduction

 

Manual Cement Roof Tile Manufacturing Machinery

 

Production Process

1. Vibration

After the vibration of the mixture caused by cement, sand and water, the water will be removed during the production process

2. Curing

Generally, wet tiles should be cured naturally on the tray for 24 hours, and the humidity and temperature should be controlled at the same time. When the surface of the tiles is firm, the tray should be removed and watered every day of the first week, and the water should be more. It is best to place the tiles vertically and require 28 days of curing time before sales.

 

Material consumption

1. The raw materials should be mixed with a grinding mixer for 5 to 10 minutes. Cement / Sand /

2. Position: host operation / mixer supply and operation / moving wet products to tile racks / moving green products to curing room / color painting / tile delivery and packaging

 

product-1000-612

 

product-1000-490

product-1000-578

product-1000-786

product-1000-790

product-1000-782product-1000-395

 

 

Hot Tags: manual cement roof tile manufacturing machinery, China, manufacturers, suppliers, factory, cheap, low price, price

You Might Also Like

Send Inquiry

whatsapp

Phone

E-mail

Inquiry